Infrastructure works
tunnels, rail, airports, roads and bridges. more
The project consisted of the re-provisioning of Kennedy Town swimming pool to make way for the new MTRC West Island Line. ADR prepared claims for the main contractor to support its entitlement to extensions of time, and submissions to substantiate and value the subsequently employed delay recovery measures. These submissions included a number of explanatory overview presentations made to the employer's senior management.
The project consisted of the fast track construction of a double bay aircraft maintenance hangar with a steel roof structure supported by eight mega columns. ADR prepared claims for the main contractor with respect to delays and disruption to the design, fabrication and erection of the steel roof structure.
One Island East consisted of the construction of a 'grade A', high rise retail / office development procured on a lump sum guaranteed maximum price (GMP). ADR advised on measurement issues connected with the GMP and prepared a report on the delays and disruption to the E&M installations.
The 2008 Olympic Equestrian was held in a specially built HK$0.25 billion venue in Hong Kong. ADR provided commercial and contractual advice together with contract administration support to the main contractor responsible for the structures and associated E&M services.
tunnels, rail, airports, roads and bridges. more
power stations, sewerage treatment works, water treatment plants and E&M installations. more
foundations, reclamations and site formation. more
commercial and residential developments. more
Second longest span cable-stayed bridge in the world. more
Twin TBM bored tunnels link Hong Kong's East Rail and West Rail. more
Two drill and blast, 3 lane road tunnels... more
Celebrities join us for the "we will rock you" themed ball on 24 June 2011... more
ADR's annual cocktail party held at the China Club on 9 June 2011... more
Case Study: Bored Piling. more